Use of PVC tubing requires special techniques to prevent leakage. All assembly work must be done with heated tube. Cold durometer is 90 as opposed to rubber hose at 65 to 70 durometer. Banding buckles must be at 180º from one another.

Safety Alert: Boss couplings and the steam quick disconnects are the only Dixon couplers recommended for steam service
Unit of Measure

Specifications

Tube OD

N/A 3 in

Dimension A

N/A 4.50 in

Dimension B

N/A 2.870 in

Dimension C

N/A 3.000 in

Material

N/A 316L Stainless Steel